İnşaat Malzeme

Geri



Ezberler İnş. Turzm. bilgileri

 











Faydalı Bilgiler

Suction Head (water) : The POSITIVE pressure [in feet (meters) or pounds per square inch] on the suction side of a pump. The pressure can be measured from the centerline of the pump UP TO the elevation of the hydraulic grade line on the suction side of the pump.
Surface Runoff (water) : Œ The precipitation that cannot be absorbed by the soil and flows across the surface by gravity. The water that reaches a stream by traveling over the soil surface or falls directly into the stream channels, including not only the large permanent streams but also the tiny rills and rivulets. 3) Water that remains after infiltration, interception, and surface storage have been deducted from total precipitation.
İŞLETMEYE GEÇİŞ : Mal sahibinin tesise yerleşmesinden önce ve mal sahibince atanan işletme ve bakım personelinin kontrolü ele alması ile sistemin, işletme ve kontrol dönemine başlaması.
Bina yüksekliği: İmar yönetmeliğine göre binanın arsada kot aldığı noktadan saçak düzeyine kadar olan yükseklik.



www.insaatmalzeme.com