Oskay İnşaat bilgileri

|
Faydalı Bilgiler
Construction Management (const) : The overall management of the processes required to bring the site operations of a project to a satisfactory conclusion, typically carried out either by a private consultant or an employee of the project client. Is a management form of contract synonymous with management contracting except that works contractors are appointed as direct contractors to the client, rather than as subcontractors to the contract manager.
Noncompatible Pollutants (water) : Those pollutants which are normally NOT removed by the POTW treatment system. These pollutants may be a toxic waste and may pass through the POTW untreated or interfere with the treatment system. Examples of noncompatible pollutants include heavy metals such as copper, nickel, lead, and zinc; organics such as methylene chloride, 1,1,1trichloroethylene, methyl ethyl ketone, acetone, and gasoline; or sludges containing toxic organics or metals.
SÜTUN : 1.Taştan yapılmış taşıyıcı direk, kolon. Eskiden sütun sözü daha çok kagir, silindirsel ayakları anlatmakta kullanılırdı. 2.Silindir biçiminde dikilitaş.
duvarları ortaktır.
|
|