Empty Bed Contact Time (water) : The time required for the liquid in a carbon adsorption bed to pass through the carbon column assuming that all liquid passes through at the same velocity. lt is equal to the volume of the empty bed divided by the flow rate.
Two-stage Tender (const) : With a two-stage tender three or four con-tractors with appropriate experience are first separately involved in detailed discussions with the client's professional advisers regarding all aspects of the project. Price competition is introduced in the second stage.