İnşaat Malzeme

Geri



Demirel Emlak bilgileri

 











Faydalı Bilgiler

Dead End (water) : The end of a water main which is not connected to other parts of the distribution system by means of a connecting loop of pipe.
Commodity-Demand Method (water) : A cost allocation method used by water utilities to determine water rates for the various water user groups. This method considers the commodity costs (water, chemicals, power, amount of water use), demand costs (treatment, storage, distribution), customer costs (meter maintenance and reading, billing, collection, accounting) and fire protection costs.
ARŞİV ÇİZİMLERİ : İnşaat tamamlandıktan sonra, fiilen yapılan işi gösteren çizimlerdir (planlardır).
Karo: Dört köşe kaplama gereci. Karolar çokluk pişmiş toprak, beton,taş,plastik gibi gereçlerle yapılırlar.



www.insaatmalzeme.com