Vizyon Emlak bilgileri

|
Faydalı Bilgiler
Management Contracting (const) : Is the method of carrying out a construction project whereby a contractor is appointed at the pre-construction stage and paid on a fee basis, to manage and deliver the project. The fee comprises a percentage for profit and fixed overheads. All construction work is carried out by the sub-contractors, selected and appointed in consultation with the client and his professional advisers.
Outfall (water) : Œ The point, location or structure where wastewater or drainage discharges from a sewer, drain, or other conduit. The conduit leading to the final disposal point or area.
ANA YÜKLENİCİ : Mal sahibi ile sözleşme yapan yüklenici.
Hazır beton: Bir beton santralinde üretilerek transmikserle yapı yerine getirilen taze beton.
|
|