Kılınç Emlak bilgileri

|
Faydalı Bilgiler
Negotiated Contract (const) : In a negotiated contract the client selects, at the outset, one main contractor with whom to negotiate. In essence the arrangement is the same as that for a two-stage tender.
Orifice (water) : An opening (hole) in a plate, wall, or partition. An orifice flange or plate placed in a pipe consists of a slot or a calibrated circular hole smaller than the pipe diameter. The difference in pressure in the pipe above and at the orifice may be used to determine the flow in the pipe.
TELAFİ PROGRAMI : Bu program master programa göre olan gecikmeyi kapatmak için gereken faaliyet ve özel çabaları gösterir. Burada, her istenen proje ekip üyesinin faaliyetleri de gösterilebilir.
Fuga demiri: Derz yapılırken harcı sıkıştırmakta kullanılan alet.
|
|