Fast Tracking (const) : Fast tracking is a means of reducing project time by the overlapping of design and construction. Each trade's work commences as its plans and specifications are substantially completed.
Monomictic (water) : Lakes and reservoirs which are relatively deep, do not freeze over during the winter months, and undergo a single stratification and mixing cycle during the year. These lakes and reservoirs usually become destratified during the mixing cycle, usually in the fall of the year.
BÜTÇE : Bir inşaat projesi için mal sahibi tarafından ayrılan, para ve zaman miktarı.
Temel: Bir yapının sağlam zemine oturtulan ve yapıdan gelen yükleri zemine aktaran bölümü.
|
|